The Floor Construction Process

There are several important aspects of the floor construction process, and understanding them is crucial to the end result. A well-constructed floor can last for years and require little maintenance. A suspended floor, for example, should be constructed in such a way as to withstand fire. The main reason for building a fire-resistant floor is to ensure that the occupants of the house have ample time to escape in the event of a fire. The construction process also includes ensuring that all materials used are fire-resistant.

The foundation of walls should be made of concrete, which forms a damp-proof course. Next, the concrete slab should be evenly spread. After this, the hardcore part of the floor is installed, consisting of crushed or graded bricks. Typically, this hardcore bed is 100-300 mm deep. This layer is then covered with concrete. Once the concrete is in place, the floor is ready to be laid. However, if it is a multi-storey building, the hardcore bed should be a minimum of 3 inches thick.

In addition to the above-mentioned elements, the floor construction process must also be carefully planned. A good process will involve the coordination of various trades throughout the construction process. When the team has been divided into teams, they should establish the responsibility of each group and reinforce the use of fire-resistant materials. A good way to start is by placing a measuring pad every three meters around the building. After marking the pad, the construction team should use a level to measure the height error and make a note of the result.

The floor construction process can be divided into four stages. First, a trial mix of the concrete will be done on the floor. This will allow for an accurate understanding of the concrete’s strengths and weaknesses. Then the reinforcement of the concrete will be added to the structure. A second, more challenging stage of the floor construction process involves the installation of a reinforced concrete column. A third stage involves the installation of ground beams. It involves a number of stages, including the preparation of the concrete.

Depending on the type of adhesive, there are a number of steps to follow to ensure that the floor is flat. First, the floor must be cleaned to remove debris. Then, a second rest is necessary to ensure that the electrode is flush with the floor material. It’s important to note that different adhesives require different methods for construction, so the instructions that accompany the product can vary slightly. If you have a floor construction project in mind, make sure to check out the manual carefully.

Another important step in the floor construction process is installing the reference row. This eliminates the cumulative error of each area. During the process of installing the reference row, the theodolite must be used to calibrate the floor’s level. Then, the base row is installed, which includes eight floors. Once the floor is installed, the screws need to be tightened accordingly, depending on the progress of the laying process. Additionally, the transport personnel should wear clean soft-soled shoes and should avoid wearing tight-fitting clothing.